Company Name Address, Phone #Project Punch List Date: Project Name:,Project Address:OWNERS and BUILDER agree that a walk through inspection was made on , 20 , by the undersigned. The following is
Form Popularity final punch list
graph

Rate final punch form

4.2
Satisfied
22 votes

How it works

Open contractor punch list in the PDFfiller editor
Make changes to final list form if needed
Make a payment and get a form in your email

Find Contractor's Final Punch List right from the SellMyForms library, customize and share it

Find, fill out, edit, download and share professional PDF documents from the SellMyForms library to save time when it comes to creating and changing documents. Buyers can find the Contractor's Final Punch List using catalog, instantly edit, sign and download it to their device or cloud storage.

What can I do to the Contractor's Final Punch List online?

Use SellMyForms to easily complete, sign, and edit templates before purchasing:

  1. Click Open to access the document
  2. Fill out the required fields, follow the instructions for the types of input
  3. Click Next to move from one fillable field to another

Discover additional editing features to personalize your template: format the text, insert signature fields, add images, and much more.

My Contractor's Final Punch List is ready. What’s next?

Once your document is ready, pay for it and you'll get it emailed to you right away. Download it to your device or cloud storage.

Join pdfFiller to share this Contractor's Final Punch List with your coworkers, friends, or customers, make it a ready-made template, and securely store in your account.

Quick tip: Do you have professional PDFs that might be useful to other people? Upload your forms to SellMyForms and earn money with each download.

FAQ

A punch list (also called a snag list, deficiency list, or punch out list), according to the online Business Dictionary, is “a document listing work that does not conform to contract specifications, usually attached to a certificate of substantial completion.”

Examples of common punch list items include damaged materials (such as drywall or a cracked driveway), items installed incorrectly (flooring or cabinetry), plumbing and electrical defects, and issues with mechanical components (thermostats, ductwork, appliances, etc.).

Be present near the end of the project. Inspect the work. Ask questions. Consult. Have an eye for detail. Be prepared and helpful. Get it done. Follow-up. Communicate changes in scope. Design Intent. Confirm what was built.

A punch list is a document prepared near the end of a construction project listing work not conforming to contract specifications that the general contractor must complete prior to final payment.

A punch list is a list of tasks and items that need to be fixed or completed before a construction project can be considered finished. ... To ensure the best review process, the contractor, subcontractor, owner, and architect should all walk through the project together.

The punch list, also known as a snag list in the U.K., is a document showing work that still needs to be done on a construction project. Another fun fact and mini history lesson is that the term punch list comes from the antiquated process of actually punching holes in a list to mark which items needed fixing.

Be present near the end of the project. Inspect the work. Ask questions. Consult. Have an eye for detail. Be prepared and helpful. Get it done. Follow-up. Communicate changes in scope. Design Intent. Confirm what was built.

It's usually prepared towards the end of a construction project and documents all the work that doesn't conform to the contract provisions. The punch list could include things like incorrect installations (flooring, cabinetry), or incidental damage to existing finishes (floors), material and structures.

A punch list is a document prepared near the end of a construction project listing work not conforming to contract specifications that the general contractor must complete prior to final payment.

Pack your bag. Verify repairs. Check general sale items. Open windows and doors. Head to the bathroom. Confirm the condition of the kitchen. Don't forget the laundry room. Make all systems go.